Categories
Sin categoría

Healthcare Projections. How long until 600 beds?

In this project of an expansion wing for a NYC healthcare institution, We were asked to analyse over 10 years of patient records for different types of illnesses to determine their future need and take action with design. Therefore we were asked: How long until 400, 500 or 600 Beds?. Specifically, we used predictive analytics to establish the projected flux of thearment and patient from 2020 to 2040. As a result we proposed an integral design strategy from existing data, a new inpatient tower that also will take care of improving circulation with tunnels and bridges, and relocating diverse sub departments for their future needs.